close project meaning in Chinese
关闭工程
关闭专案
Examples
- Thus it can be seen the psd project is better than the closed project . at last from the aspects of technology performance , economy and society , the pcs method is used to evaluate the open project , closed project , and psd project
最后,从技术性能、经济、社会几方面采用综合模糊评判法对开式、闭式、屏蔽门式三种环控方案进行综合评判,开式环控方案以其投资最小而占最优。 - First the technology evaluation is done with specialist method and fuss - math method . by the biggest membership principle , the psd project is concluded to be optimum . the following from the economical point of view , the investment and total cost of the closed project and psd project are analyzed
文中首先对三种环控方案运用专家评分和模糊数学方法进行技术评价,根据最大隶属度原则,选出站台屏蔽门方案为最优方案。 - And the evaluation target of the cost reclamation length is used to do financial evaluation . though the preliminary investment of the psd project is higher , its running cost is lower . so the total cost is lower and the more cost than that of the closed project is reclaimed in short period
接着从经济上,对闭式环控方案与站台屏蔽门方案进行投资、总成本费用分析,然后运用投资回收期指标对两种环控方案进行财务评价,得出站台屏蔽门方案虽然初投资较高,但总成本费用少,多出的投资能在短期内收回,因此屏蔽门方案优于闭式方案。